ITD_IT_Proc_2026_WAN Connectivity_Barishal Procurement of WAN Connectivity for Office/ Branches/ATM Booth/Sub Branch Under Barishal Division of...
  • Tender price: 1500
  • Security fee: 100000

ITD_IT_Proc_2026_WAN Connectivity_Barishal Procurement of WAN Connectivity for Office/ Branches/ATM Booth/Sub Branch Under Barishal Division of...

ITD_IT_Proc_2026_WAN Connectivity_Barishal Procurement of WAN Connectivity for Office/ Branches/ATM Booth/Sub Branch Under Barishal Division of Sonali

  • Publish date: 15 Oct, 2026
  • Opened date: 01 Nov, 2026
  • Deadline: 01 Nov, 2026
ITD_IT_Proc_2026_WAN Connectivity_Sylhet Procurement of WAN Connectivity for Office/ Branches/ATM Booth/Sub Branch Under Sylhet Division of Sonali...
  • Tender price: 1500
  • Security fee: 100000

ITD_IT_Proc_2026_WAN Connectivity_Sylhet Procurement of WAN Connectivity for Office/ Branches/ATM Booth/Sub Branch Under Sylhet Division of Sonali...

ITD_IT_Proc_2026_WAN Connectivity_Sylhet Procurement of WAN Connectivity for Office/ Branches/ATM Booth/Sub Branch Under Sylhet Division of Sonali Ban

  • Publish date: 15 Oct, 2026
  • Opened date: 01 Nov, 2026
  • Deadline: 01 Nov, 2026
At SSAE-Way/CGD Section: Through Sleeper renewal with MG PC Sleeper (New) at line no. 05 (Down sorting line) including supply of P-way fitting &...
  • Tender price: 2500
  • Security fee: 300000

At SSAE-Way/CGD Section: Through Sleeper renewal with MG PC Sleeper (New) at line no. 05 (Down sorting line) including supply of P-way fitting &...

At SSAE-Way/CGD Section: Through Sleeper renewal with MG PC Sleeper (New) at line no. 05 (Down sorting line) including supply of P-way fitting & faste

  • Publish date: 15 Oct, 2026
  • Opened date: 09 Nov, 2026
  • Deadline: 09 Nov, 2026
At SSAE-Way-CGD Section: Construction of new loop line MG track by 75lbs A rail (SH) with PSC Sleeper total length=0.5 km. at Cattogram Patanga Silo...
  • Tender price: 4000
  • Security fee: 600000

At SSAE-Way-CGD Section: Construction of new loop line MG track by 75lbs A rail (SH) with PSC Sleeper total length=0.5 km. at Cattogram Patanga Silo...

At SSAE-Way-CGD Section: Construction of new loop line MG track by 75lbs A rail (SH) with PSC Sleeper total length=0.5 km. at Cattogram Patanga Silo S

  • Publish date: 15 Oct, 2026
  • Opened date: 09 Nov, 2026
  • Deadline: 09 Nov, 2026
Development work of Roads with construction of Pipe Drain for Khilkhet Uttarpara Ekushe Road(from Ekushe Bhaban to Bhuya Bari) and bye Lanes which...
  • Tender price: 4000
  • Security fee: 1300000

Development work of Roads with construction of Pipe Drain for Khilkhet Uttarpara Ekushe Road(from Ekushe Bhaban to Bhuya Bari) and bye Lanes which...

Development work of Roads with construction of Pipe Drain for Khilkhet Uttarpara Ekushe Road(from Ekushe Bhaban to Bhuya Bari) and bye Lanes which H/N

  • Publish date: 15 Oct, 2026
  • Opened date: 08 Nov, 2026
  • Deadline: 08 Nov, 2026
At SSAE/Way/NRC section: Through renewal of Bridge Sleeper of Bridge No:26 (Meghna) Dn. line including changing of rails, fittings & fastening with...
  • Tender price: 4000
  • Security fee: 680000

At SSAE/Way/NRC section: Through renewal of Bridge Sleeper of Bridge No:26 (Meghna) Dn. line including changing of rails, fittings & fastening with...

At SSAE/Way/NRC section: Through renewal of Bridge Sleeper of Bridge No:26 (Meghna) Dn. line including changing of rails, fittings & fastening with ot

  • Publish date: 15 Oct, 2026
  • Opened date: 09 Nov, 2026
  • Deadline: 09 Nov, 2026
ZPC/ADP-G/ADP-SV/26-27/07 1) Construction of a vehicle parking garage for the staff of the Chandpur Zila Parishad staff quarters. 2)... (07))
  • Tender price: 2500
  • Security fee: 150000

ZPC/ADP-G/ADP-SV/26-27/07 1) Construction of a vehicle parking garage for the staff of the Chandpur Zila Parishad staff quarters. 2)... (07))

ZPC/ADP-G/ADP-SV/26-27/07 1) Construction of a vehicle parking garage for the staff of the Chandpur Zila Parishad staff quarters. 2) Installation of a

  • Publish date: 15 Oct, 2026
  • Opened date: 05 Nov, 2026
  • Deadline: 05 Nov, 2026
ZPC/ADP-G/26-27/06 1) Construction of a road leading to the residence of Nizam Uddin Ripon and a guide wall along the pond bank in Hajiganj... (06))
  • Tender price: 1000
  • Security fee: 70000

ZPC/ADP-G/26-27/06 1) Construction of a road leading to the residence of Nizam Uddin Ripon and a guide wall along the pond bank in Hajiganj... (06))

ZPC/ADP-G/26-27/06 1) Construction of a road leading to the residence of Nizam Uddin Ripon and a guide wall along the pond bank in Hajiganj Upazila. 2

  • Publish date: 15 Oct, 2026
  • Opened date: 05 Nov, 2026
  • Deadline: 05 Nov, 2026